# Weir wins order for 14 GEHO pumps for Lloyds Metals slurry pipeline

Lloyds Metals and Energy Limited awarded Weir an order to supply 14 GEHO TZPM 2000 positive displacement pumps for the second phase of its slurry pipeline project at the Surjagarh mine in Maharashtra, India. The order was secured in Q1 2026.

- Type: Contract
- Announced: 2026-06-18
- Where: Surjagarh mine, Maharashtra, India
- Status: announced
- Capacity: 16 million tonnes per annum (pipeline capacity)
- Products: GEHO TZPM 2000 positive displacement pumps, GLORES load reduction system
- Sectors: [Mining Equipment](https://endata.com/sectors/mining-equipment.md), [Pumps and Valves](https://endata.com/sectors/pumps-valves.md)

## Companies

- [Weir Group](https://endata.com/companies/797.md) (supplier)
- [Lloyds Metals and Energy](https://endata.com/companies/14384.md) (customer)

## Sources

- [eng-africa.co.za](https://eng-africa.co.za/weir-secures-significant-order-for-its-geho-pd-pumps/), 2026-06-18: "This win shows the strength of our technology."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
