# Passarelli invests R$609M to expand Sabesp wastewater treatment plant

Passarelli, leading a consortium with Consbem, Engeform and Enfi, is investing R$609 million in equipment to expand the ETE Parque Novo Mundo wastewater treatment plant in São Paulo. The capacity will increase from 2.5 to 6.5 cubic meters per second, with completion expected in 2027.

- Type: Expansion
- Announced: 2026-05-19
- Where: São Paulo, Brazil
- Value: $120.0M (609.0M BRL)
- Jobs: 98
- Starts operating: 2027
- Status: under construction
- Capacity: from 2.5 to 6.5 cubic meters per second
- Products: wastewater treatment equipment
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [Passarelli](https://endata.com/companies/92018.md)
- [Sabesp](https://endata.com/companies/14190.md) (customer)
- [Consbem](https://endata.com/companies/92019.md) (partner)
- [Engeform](https://endata.com/companies/92020.md) (partner)
- [Enfi](https://endata.com/companies/92021.md) (partner)

## Sources

- [www1.folha.uol.com.br](https://www1.folha.uol.com.br/colunas/painelsa/2026/05/passarelli-investe-r-609-milhoes-para-ampliar-tratamento-de-esgoto-da-sabesp.shtml), 2026-05-19: "A autora da obra, Passarelli, espera que a capacidade de tratamento da ETE aumente de 2,5 para 6,5 metros cúbicos por segundo de esgoto, triplicando o volume processado."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
