# Tallgrass and Mitsubishi Power Americas announce turbine allocation for Cheyenne Power Hub

Tallgrass and Mitsubishi Power Americas announced the delivery location for the first two M501JAC gas turbines for Phase 1 of the Cheyenne Power Hub in southeast Wyoming. The turbines will provide approximately 1,150 MW of power, representing an investment exceeding $7 billion and creating over 100 long-term local jobs.

- Type: Contract
- Announced: 2026-05-18
- Where: southeast Wyoming, United States
- Value: $7.00B
- Jobs: 100
- Status: announced
- Capacity: 1,150 MW
- Products: M501JAC gas turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Mitsubishi Power Americas](https://endata.com/companies/9971.md) (supplier)
- [Tallgrass](https://endata.com/companies/64782.md) (customer)

## Sources

- [crweworld.com](https://crweworld.com/article/news-provided-by-jcn-newswire/3842465/tallgrass-and-mitsubishi-power-americas-announce-turbine-allocation-for-cheyenne-power-hub), 2026-05-18: "This milestone reflects the strength of collaboration between Tallgrass and Mitsubishi Power to deliver reliable, scalable power where it’s needed most."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
