# Ferrosource building steel processing facility on Big River Steel campus in Arkansas

Ferrosource is nearing completion of a steel processing facility on U.S. Steel's Big River Steel Works campus in Osceola, Arkansas. Operations are scheduled to begin in August 2026.

- Type: New facility
- Announced: 2026-04-30
- Where: Osceola, Arkansas, United States
- Starts operating: Aug 2026
- Status: under construction
- Products: processed steel (galvanized, galvalume, galvannealed, pre-painted, cold rolled steel)
- Sectors: [Steel and Metal Products](https://endata.com/sectors/steel-metal-products.md)

## Companies

- [Ferrosource](https://endata.com/companies/91662.md)
- [United States Steel Corporation](https://endata.com/companies/15282.md) (partner)

## Sources

- [business.sherbrookerecord.com](https://business.sherbrookerecord.com/observerreporter/article/gnwcq-2026-4-30-ferrosource-builds-new-state-of-the-art-metal-processing-facility-on-big-river-steel-campus-in-osceola-arkansas), 2026-04-30: "We have seen tremendous market interest in this model — zero inbound freight, on-campus processing, and multi-modal outbound logistics at one of the most advanced steel mills in the world."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
