# Worley awarded FEED for Dow Path2Zero cogeneration in Canada

Worley was selected by Dow to provide front-end engineering design (FEED) under an EPCM contract for a brownfield cogeneration facility with integrated carbon capture at Dow's Path2Zero site in Fort Saskatchewan, Alberta, targeted to be operational by end of 2030.

- Type: Contract
- Announced: 2025-07-24
- Where: Fort Saskatchewan, Alberta, Canada
- Status: announced
- Products: cogeneration, carbon capture
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Worley](https://endata.com/companies/5716.md)
- [Dow](https://endata.com/companies/2996.md) (customer)

## Sources

- [chemxplore.com](https://chemxplore.com/news/delivering-feed-dow-path2zero-cogen-canada), 2026-04-28: "Worley was selected by Dow to provide front-end engineering design (FEED) under an engineering, procurement and construction management (EPCM) contract for the cogeneration element of the Path2Zero expansion in Fort Saskatchewan, Alberta."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
