# Inner Mongolia Energy Group tenders main equipment for Jinshan Phase 5 coal power project

Inner Mongolia Energy Group announced the winning bidders for the boiler, turbine, and generator for its Jinshan Phase 5 1x600MW coal power project. Harbin Turbine Company bid CNY 799.9 million and Shanghai Boiler Company bid CNY 911.7 million.

- Type: Contract
- Announced: 2026-04-14
- Where: Inner Mongolia, China
- Value: $110.0M (799.9M CNY)
- Status: announced
- Capacity: 1x600 MW
- Products: boiler, turbine, generator
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Inner Mongolia Energy Group](https://endata.com/companies/68483.md)
- [Harbin Turbine Company](https://endata.com/companies/24948.md) (supplier)
- [Shanghai Boiler Company](https://endata.com/companies/91371.md) (supplier)

## Sources

- [chinatpg.com](http://chinatpg.com/home/news/pages/n_id/165882.html), 2026-04-14: "内蒙古能源集团金山五期1×60万千瓦煤电项目锅炉、汽轮机和发电机及其附属设备采购中标候选人公示"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
