# Marcegaglia awards Danieli €450M contract for steel plant in Fos-sur-Mer, France

Marcegaglia and Danieli have signed a contract worth approximately €450 million for the realization of a steel production and hot rolling coil facility in Fos-sur-Mer, France. The total project capex is about €1 billion, with annual production capacity of over 2 million tonnes of steel from electric arc furnace and up to 3 million tonnes of hot-rolled coils.

- Type: Contract
- Announced: 2026-04-13
- Where: Fos-sur-Mer, France, France
- Value: $490.0M (450.0M EUR)
- Status: announced
- Capacity: over 2 million tonnes of steel per year (EAF) and up to 3 million tonnes of hot-rolled coils per year
- Products: steel from electric arc furnace, hot-rolled coils in stainless and carbon steel
- Sectors: [Steel and Metal Products](https://endata.com/sectors/steel-metal-products.md)

## Companies

- [Danieli](https://endata.com/companies/15743.md) (supplier)
- [Marcegaglia](https://endata.com/companies/24769.md) (customer)

## Sources

- [fos-sur-mer.marcegaglia.com](https://fos-sur-mer.marcegaglia.com/le-contrat-pour-le-site-de-fos-sur-mer-attribue-a-danieli/), 2026-04-13: "Marcegaglia et Danieli annoncent conjointement la signature d’un accord portant sur la réalisation d’un investissement stratégique dans une installation de production d’acier et de laminage à chaud de coils à Fos-sur-Mer, en France."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
