# Arabelle Solutions to build new workshop in Belfort, double turbine capacity

Arabelle Solutions will build a new 20,000 m² workshop in Belfort for €350 million, doubling turbine production capacity to two per year, and plans to hire 600 people by 2030.

- Type: Expansion
- Announced: 2026-03-30
- Where: Belfort, France
- Jobs: 600
- Status: announced
- Capacity: 2 turbines per year
- Products: nuclear propulsion turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Arabelle Solutions](https://endata.com/companies/13557.md)

## Sources

- [ici.fr](https://www.ici.fr/emissions/l-info-d-ici-ici-belfort-montbeliard/arabelle-solutions-qui-fournira-les-turbines-nucleaires-du-futur-porte-avion-recrute-et-s-etend-a-belfort-1333213), 2026-03-30: "L'objectif est de doubler notre capacité de production à Belfort."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
