# Radiant Ridge Energy launches generator assembly facility in Alberta

Radiant Ridge Energy Limited announced a new generator assembly facility in Alberta, Canada, with initial capacity to support 200 MW of generator equipment per year. Construction begins June 2026, with full production expected in 2027.

- Type: New facility
- Announced: 2026-03-20
- Where: Alberta, Canada
- Starts operating: 2027
- Status: announced
- Capacity: 200 MW per year
- Products: modular generator units, gas-fired power plant equipment
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Radiant Ridge Energy Limited](https://endata.com/companies/90962.md)

## Sources

- [globenewswire.com](https://www.globenewswire.com/news-release/2026/03/20/3259954/0/en/Radiant-Ridge-Energy-Limited-Announces-Alberta-Manufacturing-Initiative-to-Support-North-American-Power-Infrastructure.html), 2026-03-20: "Radiant Ridge Energy Limited (RRE) is pleased to announce the launch of its Alberta Manufacturing Initiative, featuring a new generator assembly facility designed to meet the growing demand for modular power generation."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
