# Exicom inaugurates integrated manufacturing facility in Hyderabad, India

Exicom Tele-Systems Limited inaugurated a new integrated manufacturing facility in Hyderabad, built with an investment of $24 million (₹216 crore). The plant spans 18.4 acres with 280,000 sq ft built-up area, increases production capacity by 2.5X in Phase I, and creates over 750 jobs.

- Type: New facility
- Announced: 2026-03-19
- Where: Hyderabad, India, India
- Value: $24.0M
- Jobs: 750
- Starts operating: 16 Mar 2026
- Status: completed
- Capacity: 2.5X production capacity increase (Phase I)
- Products: EV charging infrastructure, lithium-ion battery systems, critical power solutions, Tritium TRI-FLEX liquid-cooled power modules
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md), [Automation and Robotics](https://endata.com/sectors/automation-robotics.md)

## Companies

- [Exicom Tele-Systems](https://endata.com/companies/90935.md)

## Sources

- [exicom.com](https://www.exicom.com/insights/press-releases/hyderabad-manufacturing-facility-inauguration-2026), 2026-03-19: "The opening event, attended by prominent industry leaders from the telecom and EV sectors, marked a significant step in strengthening its manufacturing capabilities for power electronics."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
