# Baker Hughes wins Aramco MGS phase three compressor contract

Baker Hughes secured a contract from Saudi Aramco to supply 17 aeroderivative gas turbine-powered pipeline centrifugal compressors for phase three of the Master Gas System, booked in Q1 2024.

- Type: Contract
- Announced: 2024-04-24
- Where: Saudi Arabia, Saudi Arabia
- Status: announced
- Capacity: 17 pipeline centrifugal compressors
- Products: pipeline centrifugal compressors, aeroderivative gas turbines
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md), [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Baker Hughes](https://endata.com/companies/1895.md) (supplier)
- [Aramco](https://endata.com/companies/2946.md) (customer)

## Sources

- [offshore-technology.com](https://www.offshore-technology.com/news/baker-hughes-aramcos-mgs-project/), 2024-04-24: "The contract, booked for the first quarter (Q1) of 2024, will see Baker Hughes supplying 17 pipeline centrifugal compressors powered by aeroderivative gas turbines."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
