# Baudouin expands Cassis facility to boost power generation output

Baudouin is upgrading its Cassis, France facility with a multi-million euro investment to increase production capacity fivefold. The first phase for high horsepower engine manufacturing is complete; the second phase for genset integration is targeted for completion in 2026, with full operational capacity by 2027.

- Type: Expansion
- Announced: 2026-02-23
- Where: Cassis, France
- Starts operating: 2027
- Status: under construction
- Capacity: fivefold increase in production capacity
- Products: high horsepower engines, gensets
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md), [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [Baudouin](https://endata.com/companies/90475.md)

## Sources

- [powertraininternationalweb.com](https://www.powertraininternationalweb.com/powergen/baudouin-france-facility/), 2026-02-23: "Supported by a significant multi million euro investment, Baudouin has structured its development around two complementary steps designed to reinforce its position in large-scale power generation while preparing for a fivefold increase in production capacity."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
