# Framatome signs multi-billion euro nuclear contracts for Sizewell C in UK

Framatome signed contracts worth multi-billion euros with Sizewell C Ltd for its role in the Sizewell C nuclear new build in Suffolk, covering reactor heat production systems, I&C systems, fuel supply and maintenance services.

- Type: Contract
- Announced: 2024-04-15
- Where: Sizewell, Suffolk, United Kingdom
- Status: announced
- Capacity: two EPR reactors generating 3.2 GW
- Products: nuclear heat production systems, safety instrumentation and control systems, nuclear fuel assemblies, long-term maintenance services
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Framatome](https://endata.com/companies/3370.md) (supplier)
- [Sizewell C](https://endata.com/companies/11739.md) (customer)

## Sources

- [framatome.com](https://www.framatome.com/medias/framatome-has-signed-contracts-worth-multi-billion-euros-for-sizewell-c-in-the-uk/), 2024-04-15: "Framatome has signed contracts worth multi-billion euros with Sizewell C Ltd., laying out the scope of its involvement in the Sizewell C nuclear new build project in the UK."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
