# Quality Power advances Sangli plant construction to June 2026

Quality Power advanced the construction timeline for its Sangli plant to June 2026 from September 2026 earlier.

- Type: Expansion
- Announced: 2026-02-05
- Where: Sangli, India, India
- Starts operating: 5 Feb 2026
- Status: under construction
- Products: high-voltage equipment
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [Quality Power Electrical Equipments](https://endata.com/companies/14923.md)

## Sources

- [renewablemirror.com](https://www.renewablemirror.com/quality-power-reports-record-q3-fy26-results-with-revenue-up-256-yoy/), 2026-02-05: "The construction timeline for the Sangli plant has been advanced to June 2026 from September 2026 earlier."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
