# Boeing to accelerate 737 Max production with new Everett assembly line

Boeing is accelerating the activation of a new final assembly line for the 737 Max at its Everett plant, now scheduled to begin operations in June 2026, earlier than planned. The line will initially produce Max 8 and Max 9 variants to relieve pressure on the Renton plant.

- Type: Expansion
- Announced: 2026-01-23
- Where: Everett, Washington, United States
- Starts operating: Jun 2026
- Status: announced
- Products: 737 Max aircraft
- Sectors: [Automotive Components](https://endata.com/sectors/automotive-components.md)

## Companies

- [Boeing](https://endata.com/companies/685.md)

## Sources

- [aviation.direct](https://www.aviation.direct/en/ausweitung-der-fertigungskapazitaeten-in-everett-boeing-beschleunigt-hochlauf-der-737-max-produktion), 2026-01-26: "The so-called North Line is now scheduled to begin operations as early as June 2026 – significantly earlier than originally predicted by management."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
