# SEPC wins Rs 2.30B mining shaft order from MOIL

SEPC Limited received a Letter of Acceptance from MOIL Limited for the design, construction and commissioning of a third vertical shaft at the Chikla Mine. The contract value is about Rs 2.30 billion.

- Type: Contract
- Announced: 2026-01-06
- Where: Chikla Mine, India
- Value: $27.6M (2.30B INR)
- Status: announced
- Products: mining shaft
- Sectors: [Mining Equipment](https://endata.com/sectors/mining-equipment.md)

## Companies

- [SEPC](https://endata.com/companies/87326.md)
- [MOIL Limited](https://endata.com/companies/89476.md) (customer)

## Sources

- [constructionworld.in](https://www.constructionworld.in/energy-infrastructure/coal-and-mining/sepc-wins-rs-2.30-billion-mining-shaft-order-from-moil/84077), 2026-01-06: "SEPC Limited has received a Letter of Acceptance from MOIL Limited for the design, construction and commissioning of a third vertical shaft at the Chikla Mine."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
