# Bürkert expands Öhringen plant with new production and logistics hall

Bürkert broke ground on a new production and warehouse hall at its Öhringen, Germany plant, adding 5,800 square metres of floor space. The expansion includes an automated small-parts warehouse and increases production capacity.

- Type: Expansion
- Announced: 2024-02-17
- Where: Öhringen, Germany
- Status: under construction
- Capacity: 5,800 square metres of additional floor space
- Products: fluid control components, valves
- Sectors: [Pumps and Valves](https://endata.com/sectors/pumps-valves.md)

## Companies

- [Bürkert Fluid Control Systems](https://endata.com/companies/4272.md)

## Sources

- [industriebox.de](https://www.industriebox.de/2024/02/20/weiterer-schritt-zu-zukunftsorientiertem-wachstum/), 2024-02-20: "Die Neubauten umfassen eine zusätzliche Nutzfläche von 5.800 Quadratmetern – rund 60% nimmt die Produktion ein und ca. 40% die Bürkert-Logistik."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
