# Arab Contractors expands Qift water filtration plant in Qena, Egypt

The Arab Contractors Company is implementing the expansion of the Qift water filtration plant in Qena, Egypt, at a total cost of EGP 343 million. The first phase (EGP 145 million) is completed; the second phase (EGP 198 million) is ongoing.

- Type: Expansion
- Announced: 2025-12-07
- Where: Qift, Qena, Egypt
- Value: $7.00M (343.0M EGP)
- Status: under construction
- Capacity: 60 liters/second (phase 1)
- Products: water filtration, wastewater treatment
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [Arab Contractors Company](https://endata.com/companies/32172.md)

## Sources

- [arabcont.com](https://arabcont.com/English/Release-2025-2345), 2025-12-07: "The Deputy Prime Minister for Industrial Development inspected the expansion project of the water filtration plant within the industrial city of Qift in Qena."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
