# BvL completes expansion of assembly and logistics facilities in Emsbüren

Bernard van Lengerich Maschinenfabrik (BvL) has completed the expansion of its final assembly hall and built a new loading hall at its Emsbüren site in Germany. The project nearly doubled the assembly area for feed mixer wagons and added 3,600 square meters of storage and loading space.

- Type: Expansion
- Announced: 2025-12-03
- Where: Emsbüren, Germany
- Starts operating: 3 Dec 2025
- Status: completed
- Capacity: 3,600 square meters of storage and loading space
- Products: feed mixer wagons, self-propelled feed mixer wagons
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [Bernard van Lengerich Maschinenfabrik](https://endata.com/companies/88880.md)

## Sources

- [agrartechnikonline.de](https://www.agrartechnikonline.de/branche/neuigkeiten-bvl-mehr-produktionsflaeche-einfachere-zulassung-3161), 2025-12-03: "Die Erweiterung ist ein wichtiger Meilenstein in unserer Unternehmensgeschichte. Sie schafft Raum für moderne Fertigungsprozesse und die stetig steigende Nachfrage – insbesondere bei selbstfahrenden Futtermischwagen."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
