# JOAB doubles capacity with new production facility in Blomstermåla

JOAB inaugurated a new 2,000 sqm production facility in Blomstermåla, Sweden, doubling its capacity for refuse collection vehicles from 3 to 6 chassis assemblies per week. The investment was completed in October 2025.

- Type: Expansion
- Announced: 2025-11-21
- Where: Blomstermåla, Sweden
- Starts operating: Oct 2025
- Status: completed
- Capacity: 6 chassis assemblies per week
- Products: refuse collection vehicles
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [JOAB](https://endata.com/companies/88660.md)

## Sources

- [joab.se](https://www.joab.se/en/joab-inaugurates-new-production-facility/), 2025-11-24: "This is a significant day for JOAB and for Blomstermåla."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
