# BRUGG Lifting starts second stage of industrial park expansion in Birr

BRUGG Lifting laid the foundation stone for production hall 6 at its Birr site as part of the Industrial Park 2025 expansion. The company is investing 9.5 million Swiss francs in the hall, with completion expected in February 2026.

- Type: Expansion
- Announced: 2025-11-04
- Where: Birr, Canton of Aargau, Switzerland
- Value: $10.5M (9.50M CHF)
- Starts operating: Feb 2026
- Status: under construction
- Products: elevator system flat belts, logistics services
- Sectors: [Material Handling](https://endata.com/sectors/material-handling.md), [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [BRUGG Lifting](https://endata.com/companies/82458.md)

## Sources

- [s-ge.com](https://www.s-ge.com/invest/en/articles/news/brugg-lifting-starts-second-stage-industrial-park-expansion), 2025-11-04: "With this project, we are sending a strong signal of our innovative strength and our commitment to the region."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
