# Hanza expands Mechanics Årjäng factory for precision engineering

Hanza is completing an expansion of its Mechanics Årjäng factory in Sweden to add space for five-axis grinding and two new production lines. The expansion will be completed by end of 2025, with inauguration in February 2026.

- Type: Expansion
- Announced: 2025-10-30
- Where: Årjäng, Sweden
- Starts operating: Feb 2026
- Status: under construction
- Products: precision engineering components, gas turbine parts
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [HANZA AB](https://endata.com/companies/15172.md)

## Sources

- [hanza.com](https://hanza.com/the-factory-of-the-future-is-taking-shape-in-arjang-we-are-building-for-sustainable-growth/), 2025-10-30: "The new part of the factory will be completed before the end of the year, with final inspection in early January."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
