# ABB to open new Emax 3 production line in Senatobia, Mississippi in 2026

ABB will invest $15 million to create a new production line for Emax 3 air circuit breakers at its Senatobia, Mississippi site, expected to open in 2026.

- Type: Expansion
- Announced: 2025-09-18
- Where: Senatobia, Mississippi, United States
- Value: $15.0M
- Starts operating: 2026
- Status: announced
- Products: Emax 3 air circuit breakers
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [ABB](https://endata.com/companies/1547.md)

## Sources

- [roboticsandautomationnews.com](https://roboticsandautomationnews.com/2025/09/18/abb-to-invest-an-extra-110-million-in-us-manufacturing/94549/), 2025-09-18: "The new line is expected to open in 2026."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
