# UEC to build new turbine production complex in Rybinsk

United Engine Corporation (UEC) announced plans to build a new mechanical assembly complex in Rybinsk with an area of over 43,000 m², enabling mass production of up to four GTD-110M turbines per year. The first turbine has been operating since September 2024, and two more are to be delivered to Novocherkassk GRES between 2025 and 2026.

- Type: Expansion
- Announced: 2025-10-12
- Where: Rybinsk, Russia
- Status: announced
- Capacity: up to 4 GTD-110M turbines per year
- Products: GTD-110M gas turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [United Engine Corporation](https://endata.com/companies/13915.md)

## Sources

- [www1.ru](https://www1.ru/en/news/2025/10/12/do-cetyrex-turbin-gtd-110m-v-god-novyi-proizvodstvennyi-kompleks-v-rybinske-pozvolit-narastit-vypu.html), 2025-10-12: "The launch of new production facilities will allow reaching mass production of up to 4 GTD-110M turbines per year."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
