# InfraLeuna receives permit for €24.35M wastewater treatment expansion at Leuna chemical site

InfraLeuna GmbH received a building permit for the second construction phase of the expansion of the central wastewater treatment plant at the Leuna chemical site. The €24.35 million project includes a third aerobic treatment line and is scheduled for completion by December 2027.

- Type: Expansion
- Announced: 2025-09-30
- Where: Leuna, Saxony-Anhalt, Germany
- Value: $27.0M (24.4M EUR)
- Starts operating: Dec 2027
- Status: under construction
- Products: wastewater treatment services
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [InfraLeuna](https://endata.com/companies/45775.md)

## Sources

- [infraleuna.de](https://www.infraleuna.de/news-detail-2/infraleuna-receives-building-permit-for-expansion-of-wastewater-treatment-at-leuna-chemical-site), 2025-09-30: "InfraLeuna is investing a total of €24.35 million in the second construction phase."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
