# Saica Group builds over EUR 100 million corrugated board plant in Sant Esteve Sesrovires

Saica Group started work on a new corrugated board plant in Sant Esteve Sesrovires, Barcelona, investing more than EUR 100 million. The plant will combine Saica Pack El Prat and Saica Pack Barcelona and is due to start in spring 2025.

- Type: New facility
- Announced: 2023-12-01
- Where: Sant Esteve Sesrovires, Barcelona, Spain
- Value: $108.0M (100.0M EUR)
- Status: under construction
- Capacity: up to 45% increase in combined production of the two factories
- Products: corrugated board, recycled paper packaging
- Sectors: [Packaging](https://endata.com/sectors/packaging.md)

## Companies

- [Saica](https://endata.com/companies/631.md)
- [Saica](https://endata.com/companies/631.md) (investor)

## Sources

- [saica.com](https://www.saica.com/en/news/saica-group-invests-more-than-100-million-euros-in-a-new-corrugated-board-plant-in-barcelona/), 2023-12-13: "The new project involves an investment of more than 100 million euros and aims to increase the current joint production of the two factories by up to 45%."
- [packagingeurope.com](https://www.packagingeurope.com/saica-group-builds-corrugated-board-plant-to-combine-operations-and-increase-efficiency/), 2023-12-14: "Saica Group is building a new corrugated board plant in Barcelona with an investment of over €100 million, aspiring to increase its factories' combined production by up to 45%."
- [packaging-gateway.com](https://www.packaging-gateway.com/projects/saicas-corrugated-board-barcelona-spain/), 2024-01-03: "The new facility represents an investment of more than €100m ($107.8m). Construction started in December 2023"
- [paper-world.com](https://www.paper-world.com/en/newsdetail/saica-new-corrugated-board-plant-in-barcelona), 2024-01-07: "Work has begun on the Saica Group's new corrugated board plant in Barcelona, which is scheduled to open in spring 2025."
- [devpm.co.uk](https://www.devpm.co.uk/News/Industry/11185/saica-group-invests-in-new-font-colorwhite-font), 2024-01-10: "Saica Group has announced it is investing more than €100m (£86.7m) in a new corrugated board plant in Barcelona."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
