# CG Semi inaugurates semiconductor OSAT pilot line in Sanand, Gujarat

CG Semi Private Ltd inaugurated India's first pilot line for end-to-end chip assembly, packaging and testing at its OSAT facility in Sanand, Gujarat. The G1 facility has a peak capacity of 0.5 million units per day, with commercial production expected in 2026. A second facility with 14.5 million units per day capacity is scheduled for end of 2026.

- Type: New facility
- Announced: 2025-08-28
- Where: Sanand, Gujarat, India
- Value: $900.0M (75.0B INR)
- Jobs: 5,000
- Starts operating: 2026
- Status: under construction
- Capacity: 0.5 million units per day (G1); 14.5 million units per day (G2)
- Products: micro-controllers
- Sectors: [Semiconductors and Industrial Electronics](https://endata.com/sectors/semiconductors-electronics.md)

## Companies

- [CG Semi Private Ltd](https://endata.com/companies/86907.md)
- [CG Power and Industrial Solutions](https://endata.com/companies/16858.md) (investor)
- [Renesas Electronics America Inc.](https://endata.com/companies/32139.md) (investor)
- [Stars Microelectronics](https://endata.com/companies/75944.md) (investor)

## Sources

- [thehindubusinessline.com](https://www.thehindubusinessline.com/news/indias-1st-pilot-line-for-semiconductors-becomes-operational-in-gujarat-cg-semis-plant-to-roll-out-initial-make-in-india-chip/article69985142.ece), 2025-08-28: "Today, a pilot line of CG Power is getting operational and very soon the first chip from this pilot line will be dedicated to the nation by Prime Minister Narendra Modi."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
