# Ausnutria automates intralogistics at Heerenveen plant with Stöcklin

Ausnutria built an ultra-modern plant at its production site in Heerenveen, Netherlands, with a fully automated high-bay warehouse from Stöcklin Logistik AG. The 34-meter-high rack structure has 11,500 pallet spaces and was commissioned in 2017.

- Type: Expansion
- Announced: 2025-08-14
- Where: Heerenveen, Netherlands, Netherlands
- Starts operating: 2017
- Status: completed
- Capacity: 11,500 pallet spaces
- Products: baby and infant nutrition based on goat's milk
- Sectors: [Material Handling](https://endata.com/sectors/material-handling.md), [Food Processing Equipment](https://endata.com/sectors/food-processing-equipment.md)

## Companies

- [Ausnutria](https://endata.com/companies/5921.md)
- [Stöcklin Logistik AG](https://endata.com/companies/86635.md) (supplier)

## Sources

- [warehouselogistiek.eu](https://warehouselogistiek.eu/en/automation/intelligent-intralogistics-for-ausnutria/), 2025-08-14: "The start of our intralogistics reorganization was a fully automated high-bay warehouse for raw materials, packaging materials and filled products, which we commissioned in 2017 together with Stöcklin Logistik AG."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
