# VINCI secures €1.2B contract for Spain's largest advanced biofuel plant

Cobra IS subsidiaries Grupo Cobra and Masa have been awarded a contract by Moeve and Apical for electrical, piping and industrial mechanical works of the largest second-generation biofuel plant in Spain, located in Palos de la Frontera, Huelva. The plant will have an annual production capacity of 500,000 tonnes of sustainable fuels.

- Type: Contract
- Announced: 2025-08-06
- Where: Palos de la Frontera, Huelva, Spain
- Value: $1.32B (1.20B EUR)
- Status: announced
- Capacity: 500,000 tonnes/year
- Products: sustainable aviation fuel, renewable diesel
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [VINCI](https://endata.com/companies/32072.md)
- [Moeve](https://endata.com/companies/12469.md) (customer)
- [Apical](https://endata.com/companies/13346.md) (customer)

## Sources

- [technology4environment.com](https://www.technology4environment.com/news/98893-vinci-secures-%E2%82%AC1-2b-contract-for-spain%E2%80%99s-largest-advanced-biofuel-plant), 2025-08-06: "Moeve and Apical have awarded Grupo Cobra and Masa - both subsidiaries of Cobra IS – the electrical, piping and industrial mechanical works of the largest second-generation (2G) biofuel plant in Spain."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
