# ANDRITZ wins contract for electromechanical equipment at Traunfall hydropower plant

ANDRITZ secured a contract from Energie AG Oberösterreich to supply electromechanical equipment for a new run-of-river hydropower plant at Traunfall, Austria, including two Kaplan turbines and generators.

- Type: Contract
- Announced: 2025-07-30
- Where: Traunfall, Austria
- Status: announced
- Capacity: 125 GWh annually
- Products: Kaplan turbines, synchronous generators
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [ANDRITZ](https://endata.com/companies/2007.md)
- [ANDRITZ](https://endata.com/companies/2007.md) (supplier)
- [Energie AG Oberösterreich](https://endata.com/companies/86324.md) (customer)

## Sources

- [waterpowermagazine.com](https://www.waterpowermagazine.com/news/andritz-to-provide-equipment-for-new-traunfall-hydropower-plant-in-austria/), 2025-07-30: "ANDRITZ has secured a contract to supply electromechanical equipment for a new run-of-river hydropower plant at Traunfall."
- [energyglobal.com](https://www.energyglobal.com/other-renewables/31072025/andritz-to-supply-technology-for-the-new-traunfall-hydropower-plant/), 2025-07-31: "ANDRITZ is pleased to have been awarded the contract for the design and delivery of the electromechanical equipment."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
