# John Cockerill awarded contract for air-cooled condenser at Senegal power plant

John Cockerill was awarded a contract by NDAR Energies (Aksa Enerji Group) to design and supply a 15-module Hamon air-cooled condenser for the 255 MW combined cycle power plant in Gandon, Senegal. The plant is expected to begin commercial operations by 2026.

- Type: Contract
- Announced: 2025-07-10
- Where: Gandon, Saint-Louis, Senegal
- Status: announced
- Capacity: 255 MW
- Products: air-cooled condenser, combined cycle power plant
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Hamon](https://endata.com/companies/13164.md) (supplier)
- [NDAR Energies](https://endata.com/companies/85930.md) (customer)
- [Aksa Global Investments](https://endata.com/companies/85931.md) (customer)

## Sources

- [johncockerill.com](https://johncockerill.com/en/press-and-news/news/making-senegal-cooler-and-more-autonomous-with-the-supply-of-a-new-air-cooled-condenser/), 2025-07-10: "John Cockerill has been awarded a contract by NDAR Energies... for the design and supply of an Air-Cooled Condenser."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
