# Statkraft Värme orders 400 kW ORC turbine from Againity for Åmål plant

Statkraft Värme decided to supplement its new hot water boiler in Åmål with a 400 kW ORC turbine from Againity. The turbine will be delivered in July 2025 and is expected to generate approximately 930 MWh of electricity annually.

- Type: Contract
- Announced: 2025-07-09
- Where: Åmål, Sweden
- Status: announced
- Capacity: 400 kW
- Products: ORC turbine
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Againity](https://endata.com/companies/53240.md) (supplier)
- [Statkraft Värme](https://endata.com/companies/85880.md) (customer)

## Sources

- [bioenergyinternational.com](https://bioenergyinternational.com/againity-surpasses-new-milestone-with-60-orc-turbines/), 2025-07-09: "Statkraft in Åmål decided to supplement its new hot water boiler with an ORC turbine with a maximum capacity of 400 kW."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
